logo
Do domu > produkty > Maszyna do formowania rolki pasów drogowych >
Crash Barrier Highway Guardrail Roll Forming Machine Two Waves

Crash Barrier Highway Guardrail Roll Forming Machine Two Waves

4kw crash barrier roll forming machine

2waves crash barrier roll forming machine

two waves guardrail roll forming machine

Miejsce pochodzenia:

Chiny kontynentalne

Nazwa handlowa:

FMS

Orzecznictwo:

ISO CE

Skontaktuj się z nami
Poproś o wycenę
Szczegóły produktu
Nazwa produktu:
Maszyna do formowania rolek poręczy drogowych z barierą zderzeniową Dwie fale
Materiał rolkowy:
45# stal
Silnik:
4KW
Materiał rolek:
Obróbka hartownicza GCr15, Cr12, SKD11: HRC58-62 (opcjonalnie)
Woltaż:
380 V. 50 HZ. 3 fazy
Specyfikacja:
8*1,5*1,3 m
Prędkość:
0-15m/min
Typ cięcia:
Cięcie hydrauliczne
Podkreślić:

4kw crash barrier roll forming machine

,

2waves crash barrier roll forming machine

,

two waves guardrail roll forming machine

Warunki płatności i wysyłki
Minimalne zamówienie
1 zestaw
Cena
negotiable
Szczegóły pakowania
40' FLC
Czas dostawy
50 dni roboczych
Zasady płatności
L/C, T/T, D/A, D/P
Możliwość Supply
20 zestawów miesięcznie
Opis produktu

Crash Barrier Highway Guardrail Roll Forming Machine Two Waves

 

   In order to keep the product shape and precision, adopts welded sheet structure,motor reducer drive, chain transmission,roller was chromed which can keep the molding plate surface smooth and not easy to be marked when it is working Ensure stability , precision and lifetime.

 

Specification

ain Forming machine Forming steps 18 steps
Shaft diameter 80mm
Machine stand Individual Arch Plate
Machine frame steel plate welded
roller material Cr15
shaft material 45# steel with quenching and tempering
Work speed 0-15m/min
Transport By chains
Power of main machine 22kw
Voltage 380V-50HZ-3P(as required)
Machine dimension 14*1.5*1.2m
Machine weight About 8.5T
Machine color Yellow and blue(as required)

 

 

 

Guarantee

 

  1. Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.

  2. Repairs will not be performed even during the guarantee period in the follow circumstances

- Damage occurs due to a natural disaster

- Malfunction occurs due to user error

- Malfunction occurs due to modifications

- Malfunction occurs due to further movement or shipment after installation

 

Payment terms

 

  40% in advance as down payment

  60% is paid before the shipment is processed

 

Delivery

 

  FOB: Tianjin Xingang Port

  The Delivery Time: 60 working days after the down payment is received.

 

Crash Barrier Highway Guardrail Roll Forming Machine Two Waves 0

 

 

 

Wyślij zapytanie bezpośrednio do nas

Polityka prywatności Chiny Dobra jakość Maszyna do formowania rolek dachowych Sprzedawca. 2020-2025 Cangzhou Famous International Trading Co., Ltd . Wszelkie prawa zastrzeżone.